Closing verification on the complete logic in simulation, with clock domain crossing and lint checks and the fixes they lead to, before it is built for hardware, where debugging is slower.
Where this stage sits
This stage with its neighbours. Each row is a discipline active here, shaded by how mature its work is by the end of each stage.
Key0.0Planned0.3Early draft0.5Draft0.8Feature complete1.0CompleteFreezeFrozenFaded block: still at the step shown before it, Held below Complete or Maintained under change control once complete or frozenFreeze or sign-off pointMilestone for one item; the rest of the work carries onMilestone gateYou are here: Simulation & VerificationAI impactDDisruption (red)AAugmentation (blue)OOpportunity (green)How AI is changing the workWhat the steps meanWhat the codes mean
Design Code Completion: maturity 0.8, Feature complete. Environment complete at design code complete. Results: regressions and coverage closure under way on the complete code, with bugs going back to design.
Simulation & Verification: maturity 1.0, Complete. Results: coverage goals met, clock domain crossing checks clean or waived, and open bugs fixed or waived; every later fix is regressed.DA
Design Code Completion: maturity 0.5, Draft. Trial builds of the complete design track utilisation and timing against the agreed headroom.
Simulation & Verification: maturity 0.8, Feature complete. Timing closure under way on the near-final source, with the constraints in review.
Synthesis, Place & Route & Timing Closure: maturity 1.0, Complete. Every timing constraint met and the bitstream built from the frozen, signed-off source, with the power estimate taken from the routed design.A
Design Code Completion: maturity 0.8, Feature complete. First boards fabricated and assembled, with bare-board and power-up checks run.
Simulation & Verification: maturity 1.0, Complete. Boards checked out with test designs: rails, clocks, memories and interfaces work, ready for the product bitstream.
Design Code Completion: maturity 0.5, Draft. Drivers and board support package written against the complete design code and run in co-simulation or on a development board.
Simulation & Verification: maturity 0.5, Draft. Drivers and board support package written against the complete design code and run in co-simulation or on a development board.
Synthesis, Place & Route & Timing Closure: maturity 0.8, Feature complete. Drivers, board support package and boot code ready for the first boards, built against the timing-clean bitstream.
Design Code Completion: maturity 0.3, Early draft. Bring-up approach drafted once the board is released, with lab equipment and debug access planned.
Simulation & Verification: maturity 0.5, Draft. Lab ready and the first boards checked out with the board team; test bitstreams and scripts in preparation.
Synthesis, Place & Route & Timing Closure: maturity 0.8, Feature complete. Bring-up plan final, with test bitstreams, on-chip analyser set-ups and scripts ready for the product bitstream.
Design Code Completion: maturity 0.3, Early draft. System test plan drafted from the requirements, with test equipment and compliance laboratories arranged.
Simulation & Verification: maturity 0.3, Early draft. System test plan drafted from the requirements, with test equipment and compliance laboratories arranged.
Design Code Completion: maturity 0.5, Draft. Secure boot, bitstream encryption and authentication, and the field update scheme designed with the logic and software teams.
Simulation & Verification: maturity 0.5, Draft. Secure boot, bitstream encryption and authentication, and the field update scheme designed with the logic and software teams.
Synthesis, Place & Route & Timing Closure: maturity 0.8, Feature complete. Encryption and authentication settings in the bitstream build; secure configuration and the update route tried on the board.A
Design Code Completion: maturity 0.3, Early draft. Board components checked for availability and manufacturability, with a first approved component list at board release.
Simulation & Verification: maturity 0.5, Draft. Production programming method and manufacturing test approach agreed, using the test and programming access designed into the board.
Synthesis, Place & Route & Timing Closure: maturity 0.5, Draft. Production programming method and manufacturing test approach agreed, using the test and programming access designed into the board.
Design Code Completion: maturity 0.5, Draft. Product plan confirmed against the complete design and the board cost, with customers and the launch window agreed.
Simulation & Verification: maturity 0.5, Draft. Product plan confirmed against the complete design and the board cost, with customers and the launch window agreed.
Synthesis, Place & Route & Timing Closure: maturity 0.8, Feature complete. Launch, support and field update plans drafted against the timing-clean bitstream and the bring-up results.
Register or sign in to read on
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.
Synthesis, Place & Route & Timing Closure: maturity 1.0, Complete. Results: coverage goals met, clock domain crossing checks clean or waived, and open bugs fixed or waived; every later fix is regressed.