Use at the test capability sign-off, to confirm the program and hardware give the same answer on every production tester, hardware set and site. Run by the gate chair with the test operations engineer.
MustThe evidence pack reached every participant early enough to be read before the review.
MustThe people with decision rights for this gate, including product engineering, test engineering and quality, are present or have named a delegate in writing.
MustConditions set at the previous gate are closed, or their status is reported with evidence.
ShouldThe criteria for this gate were agreed before the evidence was prepared, not after.
MustThe test capability study is within the agreed limits for each key parameter.