Use when the released test is transferred from test development to a production test site or test subcontractor. Run by the test operations engineer as sender and the receiving site lead as receiver.
MustThe released program bundle with release notes is included.
MustProduction hardware sets and spares are delivered with their checkout reports.
MustOperator instructions, hold rules and disposition contacts are included.
19 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.