Agrees with the customer the array size, the fixed block use, the timing the design can reach and the conversion work it needs. The gate chair holds it with the customer ASIC architect.
MustThe evidence pack reached every participant early enough to be read before the review.
MustThe people with decision rights for this gate are present or have named a delegate in writing.
MustConditions set at the previous gate are closed, or their status is reported with evidence.
ShouldThe criteria for this gate were agreed before the evidence was prepared, not after.