Opens package qualification and ramp. The package qualification and reliability engineer runs it.
MustThe engineering samples gate has been passed.
MustThe package qualification plan is approved for the qualification grade.
SeeDecision: Qualification grade and package qualification planStandard: JESD47
MustQualification units are built on the production line with production materials.
MustQualification evidence for each die is requested from the die teams and die suppliers.
22 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.