Readies production release. The package qualification and reliability engineer completes it with the product line manager.
MustThe package qualification report shows every planned test passed or every failure closed.
MustEvery failure has a failure analysis report and a corrective action.
MustQualification evidence for each die is complete.
ShouldBoard-level reliability is tested where the customer requires it.
23 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.