Use at the DFT architecture aligned review, where design and test agree the test features the chip carries and how each is used on the tester. Run by the gate chair with the DFT architect and the test engineering manager.
MustThe evidence pack reached every participant early enough to be read before the review.
MustThe people with decision rights for this gate, including product engineering, test engineering and quality, are present or have named a delegate in writing.
MustConditions set at the previous gate are closed, or their status is reported with evidence.
ShouldThe criteria for this gate were agreed before the evidence was prepared, not after.
MustThe DFT architecture specification is reviewed by design and test, and approved.
31 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.