Decides that timing, power and physical checks are clean on the final layout and that it matches the netlist. The program manager runs it with the physical design lead presenting.
MustThe decision owner for this gate is named and has confirmed attendance.
MustThe required reviewers from each affected discipline are invited and have confirmed.
MustThe evidence pack was circulated early enough for reviewers to read it before the review.
MustConditions from the previous gate are closed or listed with their status for this review.
ShouldThe foundry interface lead attends to confirm deck versions and waivers.
MustVerification sign-off and DFT insertion sign-off have passed, or their conditions are closed.
39 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.