Confirms every IP block is selected, received and connected so full-chip design work can close, with the program manager chairing and the IP integration engineer presenting.
MustThe decision owner for this gate is named and has confirmed attendance.
MustThe required reviewers from each affected discipline are invited and have confirmed.
MustThe evidence pack was circulated early enough for reviewers to read it before the review.
MustConditions from the previous gate are closed or listed with their status for this review.
ShouldIP providers with open issues are available to answer questions.
MustThe specification freeze has passed and the IP selection list is final.
39 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.