Selects the device architecture and core materials the node will be built on, decided by the gate chair with the pathfinding lead and the device engineering lead.
MustThe evidence pack reached every participant early enough to be read before the review.
MustThe people with decision rights for this gate are present or have named a delegate in writing.
MustConditions set at the previous gate are closed, or their status is reported with evidence.
ShouldThe criteria for this gate were agreed before the evidence was prepared, not after.
MustThe device architecture choice is recorded with the evidence and the rejected options.