Use at the review that freezes the device design and releases masks. Run by the device design lead.
MustThe evidence pack reached every participant early enough to be read before the review.
MustThe people with decision rights for this gate are present or have named a delegate in writing.
MustConditions set at the previous gate are closed, or their status is reported with evidence.
ShouldThe criteria for this gate were agreed before the evidence was prepared, not after.
MustSimulated blocking voltage and on-resistance: meet the targets with margin.
MustGate oxide field and short-circuit withstand: within the design rules set for the technology.
39 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.