Confirms the platform's IP blocks and subsystems meet the reuse standard for every supported configuration. The gate chair runs it with the IP program manager and the IP quality engineer.
MustThe evidence pack reached every participant early enough to be read before the review.
MustThe people with decision rights for this gate, including the platform board where the gate changes the platform, are present or have named a delegate in writing.
MustConditions set at the previous gate are closed, or their status is reported with evidence.
ShouldThe criteria for this gate were agreed before the evidence was prepared, not after.
MustEvery supported configuration is verified, with coverage goals met.
33 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.