Confirms the team has the requirements, process options and people to write a specification that can be frozen, at the start of the specification stage after concept approval. The analog architect runs it with the silicon program manager.
MustConcept approval has been held and its decision record is filed.
MustThe business case is approved and states the target market, volumes and the value of the circuit.
MustProduct requirements state supply range, temperature range, load conditions and the target market.
Targets cannot be traced later if the operating conditions are not written now.
MustThe delivery route is known: block inside a SoC, stand-alone product, or test chip first.
SeeDecision: Delivery route: SoC block, stand-alone product or test chip first