Turning product needs into performance targets such as resolution, bandwidth, noise, linearity and power, choosing the circuit topology, and choosing the process and device options it needs.
Where this stage sits
This stage with its neighbours. Each row is a discipline active here, shaded by how mature its work is by the end of each stage.
Key0.0Specified0.3Sketched0.5Draft0.8Feature complete1.0CompleteFreezeFrozenFaded block: still at the step shown before it, Held below Complete or Maintained under change control once complete or frozenFreeze or sign-off pointMilestone for one item; the rest of the work carries onMilestone gateTRTechnical readiness review (TR): a gate that checks the technology is ready before the next commitment.You are here: AMS Specification & ArchitectureAI impactDDisruption (red)AAugmentation (blue)OOpportunity (green)How AI is changing the workWhat the steps meanWhat the codes mean
AMS Specification & Architecture: maturity 0.3, Sketched. Performance targets, topology, budgets and process options shown feasible at the readiness review and frozen at the specification freeze; later changes go through change control.AAO; Architecture freeze (milestone for one item)
Schematic & Circuit Design: maturity 0.5, Draft. Specification clarified against the schematic review and the verification results, with every change controlled.
AMS Verification: maturity 0.5, Draft. Specification clarified against the schematic review and the verification results, with every change controlled.
AMS Specification & Architecture: maturity 0.3, Sketched. Topology chosen with hand calculations, and the critical circuits shown feasible on the target process.
Schematic & Circuit Design: maturity 0.5, Draft. Schematics sized and simulated at nominal conditions and the main corners, reviewed at the schematic design review, then corrected from the corner runs until released to layout.D
AMS Specification & Architecture: maturity 0.3, Sketched. RF link budget and front-end architecture set, with the critical blocks shown feasible.
Schematic & Circuit Design: maturity 0.5, Draft. RF schematics sized and simulated across corners, with first electromagnetic models of inductors and key interconnect.A
AMS Verification: maturity 0.5, Draft. RF schematics sized and simulated across corners, with first electromagnetic models of inductors and key interconnect.
AMS Specification & Architecture: maturity 0.0, Specified. Verification approach, corners and statistical targets agreed from the specification.
Schematic & Circuit Design: maturity 0.3, Sketched. Verification plan final at the schematic review; test benches and first behavioural models built.D
AMS Verification: maturity 0.5, Draft. Corner and Monte Carlo results within specification or waived, behavioural models checked against the circuit and mixed-signal checks passed: pre-layout verification signed off.
AMS Specification & Architecture: maturity 0.0, Specified. Block area and layout effort estimated with the circuit designers from the chosen topology, with the matching and isolation needs noted; nothing drawn yet.
Schematic & Circuit Design: maturity 0.3, Sketched. Floorplan drafted from the reviewed schematics, with matched groups and sensitive signals identified.A
AMS Verification: maturity 0.5, Draft. Floorplan agreed, with matched devices, guard rings and sensitive routes placed; full layout starts from the schematics released to layout.
AMS Specification & Architecture: maturity 0.0, Specified. Target chip, delivery form and hand-off date agreed with the integrating team, with the views and models it will need listed; no interface defined yet.
Schematic & Circuit Design: maturity 0.3, Sketched. Interface and pin definition agreed with the chip the block goes into.
AMS Verification: maturity 0.5, Draft. Behavioural model and pin-out shared with integrators for early chip simulation.
AMS Verification: maturity 0.0, Specified. Characterisation owner named, with the bench equipment, conditions and sample numbers scoped from the specification and the verification plan; test points not yet defined.
AMS Specification & Architecture: maturity 0.3, Sketched. Business case and product requirements approved, with requirements tracked against the design.O
Schematic & Circuit Design: maturity 0.3, Sketched. Business case and product requirements approved, with requirements tracked against the design.
AMS Verification: maturity 0.5, Draft. Requirements confirmed against the verified circuit; lead customers engaged.
Register or sign in to read on
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.
AMS Verification: maturity 0.5, Draft. Schematics sized and simulated at nominal conditions and the main corners, reviewed at the schematic design review, then corrected from the corner runs until released to layout.; Schematic released to layout (milestone for one item)
AMS Verification: maturity 0.8, Feature complete. Corner and statistical models proven in the verification runs; the design kit is stable.