Fab utility demand estimator
Estimate a fab's electricity, ultrapure water, cooling, nitrogen and other utility demand from wafer starts, node and cleanroom size.
Manufacturing, fab and supplyFree to useHow it worksSourcesWhere it helps
Fills the inputs below with typical figures. Replace any of them with your own.
- Average power
- 70.6 MW
- Peak 85.13 MW with the allowance
- Annual energy
- 618.4 GWh
- 26.9 kWh per 12-inch equivalent layer
- Facility energy ratio
- 2.07
- Process tools and EUV are 48% of the total
- Cooling load
- 15,167 tons
- 12,434 tons on average; 50.8 MW of heat at full loading
- Water use
- 8,803 m³ per day
- 7,922 m³ per day from the city after 10% reclaim
- Ultrapure water
- 4,401 m³ per day
- 183.4 m³ per hour
- Nitrogen
- 5,764 Nm³ per hour
- 6,781 at full loading
- Compressed dry air
- 2,096 Nm³ per hour
- 2,466 at full loading
- Exhaust
- 1,944,000 m³ per hour
- Equal to 1,944,000 m³ per hour of make-up air
- EUV scanners
- 0
- No EUV layers
- Utility cost
- $63 m
- Per year, at the tariffs entered
- Process tools (excluding EUV scanners)298.4 GWh48.2%
- Sub-fab: vacuum pumps, abatement and tool support91.8 GWh14.8%
- Cleanroom recirculation fans35.48 GWh5.7%
- Make-up air and humidity control51.09 GWh8.3%
- Chilled water plant85.13 GWh13.8%
- Nitrogen plant22.72 GWh3.7%
- Compressed dry air2.02 GWh0.3%
- Ultrapure water and water treatment2.41 GWh0.4%
- Offices, lighting and distribution losses29.45 GWh4.8%
Show the data as a table
| Item | Energy (GWh a year) |
|---|---|
| Process tools (excluding EUV scanners) | 298.4 GWh |
| Sub-fab: vacuum pumps, abatement and tool support | 91.8 GWh |
| Cleanroom recirculation fans | 35.48 GWh |
| Make-up air and humidity control | 51.09 GWh |
| Chilled water plant | 85.13 GWh |
| Nitrogen plant | 22.72 GWh |
| Compressed dry air | 2.02 GWh |
| Ultrapure water and water treatment | 2.41 GWh |
| Offices, lighting and distribution losses | 29.45 GWh |
- Electricity, energy charge$49.5 m79%
- Water and wastewater (city water)$8.68 m14%
- Nitrogen, plant operation and maintenance$3.03 m5%
- Other bulk gases$1.84 m3%
Show the data as a table
| Item | Cost (USD a year) |
|---|---|
| Electricity, energy charge | $49.5 m |
| Water and wastewater (city water) | $8.68 m |
| Nitrogen, plant operation and maintenance | $3.03 m |
| Other bulk gases | $1.84 m |
Sign in to save your inputs and come back to them later.
| System | Average (MW) | At full loading (MW) | Energy (GWh a year) | Share |
|---|---|---|---|---|
| Process tools (excluding EUV scanners) | 34.06 | 40.07 | 298.4 | 48.2% |
| Sub-fab: vacuum pumps, abatement and tool support | 10.48 | 12.33 | 91.8 | 14.8% |
| Cleanroom recirculation fans | 4.05 | 4.05 | 35.48 | 5.7% |
| Make-up air and humidity control | 5.832 | 5.832 | 51.09 | 8.3% |
| Chilled water plant | 9.718 | 11.29 | 85.13 | 13.8% |
| Nitrogen plant | 2.594 | 3.051 | 22.72 | 3.7% |
| Compressed dry air | 0.2305 | 0.2712 | 2.02 | 0.3% |
| Ultrapure water and water treatment | 0.2751 | 0.3236 | 2.41 | 0.4% |
| Offices, lighting and distribution losses | 3.362 | 3.861 | 29.45 | 4.8% |
| Utility | Average | At full loading | Unit |
|---|---|---|---|
| Electricity | 70.6 | 85.13 | MW |
| Cooling | 12,434 | 15,167 | tons of refrigeration |
| Water use | 8,803 | 10,356 | m³ per day |
| City water taken | 7,922 | 9,321 | m³ per day |
| Ultrapure water | 4,401 | 5,178 | m³ per day |
| Nitrogen | 5,764 | 6,781 | Nm³ per hour |
| Compressed dry air | 2,096 | 2,466 | Nm³ per hour |
| Recirculated air | 24,300,000 | 24,300,000 | m³ per hour |
| Make-up air and exhaust | 1,944,000 | 1,944,000 | m³ per hour |
- Average power (solid line, circles)
- Peak power (dashed line, squares)
Show the data as a table
| Wafer starts a month | Average power | Peak power |
|---|---|---|
| 25,000 | 40.9 | 48.5 |
| 37,500 | 55.8 | 66.8 |
| 50,000 | 70.6 | 85.1 |
| 62,500 | 85.4 | 103 |
| 75,000 | 100 | 122 |
| Wafer starts a month | Average (MW) | Peak (MW) | Energy (GWh) | kWh per 12-inch equivalent layer | Water (m³ per day) | Nitrogen (Nm³ per hour) | Utility cost (USD a year) |
|---|---|---|---|---|---|---|---|
| 25,000 | 40.91 | 48.46 | 358.4 | 31.2 | 4,401 | 2,882 | $35.4 m |
| 37,500 | 55.76 | 66.79 | 488.4 | 28.4 | 6,602 | 4,323 | $49.2 m |
| 50,000 | 70.6 | 85.13 | 618.4 | 26.9 | 8,803 | 5,764 | $63 m |
| 62,500 | 85.44 | 103.5 | 748.5 | 26.1 | 11,003 | 7,205 | $76.8 m |
| 75,000 | 100.3 | 121.8 | 878.5 | 25.5 | 13,204 | 8,646 | $90.6 m |
How it works
A fab's utilities are sized long before the first wafer. This tool estimates the electricity, ultrapure water, cooling, nitrogen and compressed air a fab will draw from its wafer starts, its number of layers per wafer, its EUV scanners and its cleanroom size, with every intensity open to your own figures. It gives average and peak power, annual energy, water intake with reclaim, gas flows, the cooling load and a yearly utility bill, and shows how each changes with wafer starts.
- Wafer layer passes. Most process loads follow the number of times a wafer goes through a layer. Capacity in wafer starts a month times the layers per wafer gives layer passes a month; dividing by the hours in a month gives passes an hour at full capacity. The average runs at the loading you enter.
layer passes per hour at full capacity = wafer starts per month x layers per wafer / hours per month average layer passes per hour = full capacity passes x loading - Process tools, sub-fab and EUV. Process tool and sub-fab (vacuum pumps, abatement, tool support) electricity are an energy per layer pass times the passes an hour. EUV is counted apart: each scanner has a throughput and utilisation, the scanners needed are the EUV passes an hour over what one scanner delivers, rounded up, and each draws its power all the time, a little less when idle.
tool kW = layer passes per hour x kWh per layer EUV scanners = ceiling(EUV passes per hour / (wafers per hour per scanner x utilisation)) EUV kW = scanners x kW per scanner x (idle share + (1 − idle share) x loading) - Cleanroom air handling. A cleanroom recirculates its air through filters many times an hour. The airflow is the area times the air change rate times the height of the air path; the fans use a specific power in watts per cubic metre a second. A share of the air is fresh make-up air that must be cooled, dried or humidified, at an energy per thousand cubic metres that depends on climate. The air handling does not fall when loading falls, which is why a fab running part empty uses more energy per wafer.
recirculated air (m³/h) = area x air changes per hour x air path height fan kW = air (m³/h) / 3,600 x specific fan power (W per m³/s) / 1,000 make-up air (m³/h) = recirculated air x make-up share; make-up kW = make-up air / 1,000 x kWh per 1,000 m³ - Cooling and chillers. Nearly all the electricity inside the building ends as heat, which the chilled water plant removes. The heat load is the heat share times the process tools, EUV scanners, sub-fab and fans. One ton of refrigeration is 3.517 kW of heat. The chillers' electricity is the heat load over the plant COP, which here includes pumps and cooling towers.
heat load kW = heat share x (tools + EUV + sub-fab + fans) cooling tons = heat load / 3.517 chiller kW = heat load / COP - Water, nitrogen and compressed air. Water use follows layer passes: litres per layer pass over the day. A share is ultrapure water; a share of the whole is met by reclaimed water and the rest is taken from the city. Nitrogen, compressed dry air and other bulk gases are normal cubic metres per layer pass; the plants that make nitrogen and compressed air, and the ultrapure water plant, add electricity at a specific energy per unit made. Exhaust is taken as equal to make-up air, which holds the room at a steady pressure.
water m³/day = layer passes per hour x 24 x litres per layer / 1,000 city water = water x (1 − reclaim); ultrapure water = water x ultrapure share gas Nm³/h = layer passes per hour x Nm³ per layer; plant kW = Nm³/h x kWh per Nm³ - Totals, overhead and cost. Overhead (offices, lighting, distribution losses) is a share of the rest. Average power uses the loading you enter; peak uses 100% loading plus a margin. The facility energy ratio, a PUE-like figure, is total site electricity over process tool and EUV electricity. On-site generation lowers the energy bought but not the peak, since it may not be running at the peak. Cost is energy, demand charge, city water, nitrogen and other gases at the tariffs you enter.
total kW = (sum of loads) x (1 + overhead share) average MW = total at loading; peak MW = total at 100% x (1 + peak margin) annual GWh = average kW x hours per year / 1,000,000 facility energy ratio = total kW / (process tool kW + EUV kW)
Assumptions
- Intensities are per wafer layer of the wafer size in use, and the 12-inch equivalent figure compares by wafer area (a 200 mm wafer counts as 0.44 of a 300 mm wafer).
- Cleanroom air handling is fixed by area and does not change with loading; process loads change with the layer passes.
- All inputs are annual averages; summer and winter, shutdowns and ramp-up are not modelled.
- Electricity that is not heat in the cooled spaces (for example, pumps outside the building) is counted in the heat share you enter.
- The node defaults are editorial figures placed inside public ranges and are meant to be replaced.
Limits and warnings
- This is a planning estimate to find the size of the utilities, not a design. Utility designs add redundancy, diversity and future expansion that this tool does not size.
- Public figures are fleet averages (TSMC's reports) and a few scanner and cleanroom studies. A single fab can differ by a factor of two on any one utility.
- Wastewater, chemicals, natural gas for abatement and heating, and special gases are not sized beyond the simple flows shown.
- Make-up air energy depends strongly on climate; the default is a mild figure and a hot humid or cold dry site needs a higher one.
- On-site generation is a single average figure and does not include its own fuel or capital cost in the bill unless you include it in the tariff.
Sources
The methods and default figures rest on these public sources. The wording here is our own; read the source for its full text.
- TSMC 2024 Annual Report, chapter 7, Corporate Sustainability (ESG) (opens in a new tab), Taiwan Semiconductor Manufacturing Company, 16 April 2025. Reported: total water use 129 million m³ in 2024 and 114 million m³ in 2023, and unit water use of 161.0 and 176.4 litres per 12-inch wafer-equivalent layer; 3,610 GWh of renewable electricity, 14.1% of the total, which implies about 25.6 TWh a year (our arithmetic).
- TSMC could account for 24% of Taiwan's electricity consumption by 2030 (opens in a new tab), DatacenterDynamics, 2024 (as seen in a search listing; the page itself could not be opened). Reported by the press from TSMC's figures: electricity of 27.7 kWh per 12-inch equivalent wafer mask layer in 2022 and 40.5 kWh in 2023, as 3 nm production ramped. Treat as reported, to be checked against TSMC's own report.
- EUV Lithography: A Power-Hungry Path to Innovation (opens in a new tab), TechInsights, Undated page, read 25 October 2026. Reported: up to 10.2 GWh a year for each EUV tool, about 1.2 MW on average, and about 11% of total fab electricity.
- Shining brighter: a 10x source power efficiency boost for EUV lithography (opens in a new tab), Bits&Chips (Paul van Gerven), 9 January 2025. Reported: up to 10.2 GWh a year per EUV scanner, 12.2 GWh for high-NA, and about 10% of fab electricity.
- Energy Performance of Cleanroom Environmental Systems (LBNL-49106) (opens in a new tab), Lawrence Berkeley National Laboratory (Tengfang Xu and William Tschudi), November 2001. Measured: recirculation fan power of about 0.17 to 0.21 W per cfm in efficient systems and 0.4 to 0.8 W per cfm in poorer ones; recommended air change rates of 300 to 540 an hour for ISO 4 and 240 to 480 for ISO 5.
- Semiconductor industry faces water, sustainability challenges (opens in a new tab), Manufacturing Dive (Michelle No), 5 August 2025. Reported: a fab can need up to 10 million gallons of ultrapure water a day, an average of 76% of withdrawn water goes to the manufacturing process, and TSMC replaced 12% of its water with reclaimed water in 2023.
Where it helps
The lifecycle stages this tool serves: 2 stages in 1 lifecycle.
More manufacturing, fab and supply tools
Method notev1Formula, ranges, sources and limits
Estimates a fab's average and peak electrical power, annual energy, water, nitrogen and cooling demand from wafer starts, layers per wafer, EUV scanners and cleanroom size, with a yearly utility cost.
Formula
layer passes per hour at full capacity = wafer starts per month x layers per wafer / hours per month; average layer passes per hour = full capacity passes x loading; tool kW = layer passes per hour x kWh per layer; EUV scanners = ceiling(EUV passes per hour / (wafers per hour per scanner x utilisation)); EUV kW = scanners x kW per scanner x (idle share + (1 − idle share) x loading); recirculated air (m³/h) = area x air changes per hour x air path height; fan kW = air (m³/h) / 3,600 x specific fan power (W per m³/s) / 1,000; make-up air (m³/h) = recirculated air x make-up share; make-up kW = make-up air / 1,000 x kWh per 1,000 m³; heat load kW = heat share x (tools + EUV + sub-fab + fans); cooling tons = heat load / 3.517; chiller kW = heat load / COP; water m³/day = layer passes per hour x 24 x litres per layer / 1,000; city water = water x (1 − reclaim); ultrapure water = water x ultrapure share; gas Nm³/h = layer passes per hour x Nm³ per layer; plant kW = Nm³/h x kWh per Nm³; total kW = (sum of loads) x (1 + overhead share); average MW = total at loading; peak MW = total at 100% x (1 + peak margin); annual GWh = average kW x hours per year / 1,000,000; facility energy ratio = total kW / (process tool kW + EUV kW)
| Input | Unit | Range it holds for | Comes from |
|---|---|---|---|
| Wafer diameter | mm | 100 to 450 | Your figure |
| Node class | choice | mature, n28, advanced, euv, packaging | Your figure |
| Wafer starts at capacity | wafers a month | from 0 | Your figure |
| Average loading | % of capacity | 0 to 120 | Your figure |
| Layers per wafer | layer passes | 0 to 150 | Your figure |
| EUV layers per wafer | layer passes | 0 to 60 | Your figure |
| EUV scanner throughput | wafers per hour | 0 to 400 | Your figure |
| EUV scanner utilisation | % | 0 to 100 | Your figure |
| Power per EUV scanner | kW | 0 to 3000 | Your figure |
| Scanner power when idle | % of operating | 0 to 100 | Your figure |
| Cleanroom area | m² | from 0 | Your figure |
| Cleanroom class | choice | 4, 5, 6, 7, 8 | Your figure |
| Air changes | per hour | 0 to 1000 | Your figure |
| Air path height | m | 0.5 to 10 | Your figure |
| Specific fan power | W per m³/s | 0 to 5000 | Your figure |
| Make-up air share | % of recirculated | 0 to 100 | Your figure |
| Make-up air conditioning energy | kWh per 1,000 m³ | 0 to 100 | Your figure |
| Process tool electricity | kWh per wafer layer | 0 to 100 | Editorial planning figures placed inside public ranges (TSMC annual report 2024, TechInsights, Berkeley Lab LBNL-49106). Editorial, as of 2026-10. You can replace it with your own figure. |
| Sub-fab electricity | kWh per wafer layer | 0 to 50 | Editorial planning figures placed inside public ranges (TSMC annual report 2024, TechInsights, Berkeley Lab LBNL-49106). Editorial, as of 2026-10. You can replace it with your own figure. |
| Water use | litres per wafer layer | 0 to 600 | Editorial planning figures placed inside public ranges (TSMC annual report 2024, TechInsights, Berkeley Lab LBNL-49106). Editorial, as of 2026-10. You can replace it with your own figure. |
| Ultrapure water share of water use | % | 0 to 100 | Your figure |
| Reclaimed water share | % | 0 to 100 | Your figure |
| Nitrogen | Nm³ per wafer layer | 0 to 50 | Your figure |
| Compressed dry air | Nm³ per wafer layer | 0 to 50 | Your figure |
| Other bulk gases | Nm³ per wafer layer | 0 to 10 | Your figure |
| Nitrogen plant energy | kWh per Nm³ | 0 to 2 | Your figure |
| Compressed air energy | kWh per Nm³ | 0 to 0.5 | Your figure |
| Ultrapure water plant energy | kWh per m³ | 0 to 10 | Your figure |
| Electricity that becomes cooling load | % | 0 to 100 | Your figure |
| Chilled water plant COP | ratio | 1 to 10 | Your figure |
| Offices, lighting and losses | % of the rest | 0 to 50 | Your figure |
| Peak allowance | % | 0 to 50 | Your figure |
| On-site generation | MW average | from 0 | Your figure |
| Operating days | days a year | 1 to 366 | Your figure |
| Electricity price | USD per kWh | 0 to 2 | Your figure |
| Demand charge | USD per kW a month | 0 to 100 | Your figure |
| Water and wastewater price | USD per m³ | 0 to 50 | Your figure |
| Nitrogen supply | choice | own, contract | Your figure |
| Nitrogen cost | USD per Nm³ | 0 to 5 | Your figure |
| Other bulk gases cost | USD per Nm³ | 0 to 100 | Your figure |
Outputs: Average power (MW); Peak power (MW); Annual energy (GWh); Energy per 12-inch equivalent layer (kWh); Peak cooling load (tons of refrigeration); Water use (m³ per day); City water intake (m³ per day); Ultrapure water (m³ per day); Nitrogen flow (Nm³ per hour); Utility cost (USD a year).
Assumptions
- Intensities are per wafer layer of the wafer size in use, and the 12-inch equivalent figure compares by wafer area (a 200 mm wafer counts as 0.44 of a 300 mm wafer).
- Cleanroom air handling is fixed by area and does not change with loading; process loads change with the layer passes.
- All inputs are annual averages; summer and winter, shutdowns and ramp-up are not modelled.
- Electricity that is not heat in the cooled spaces (for example, pumps outside the building) is counted in the heat share you enter.
- The node defaults are editorial figures placed inside public ranges and are meant to be replaced.
Uncertainty: The arithmetic is exact; the result is only as good as the intensities. With the editorial defaults expect any one utility to differ from a real fab by a factor of about two.
Known limits
- This is a planning estimate to find the size of the utilities, not a design. Utility designs add redundancy, diversity and future expansion that this tool does not size.
- Public figures are fleet averages (TSMC's reports) and a few scanner and cleanroom studies. A single fab can differ by a factor of two on any one utility.
- Wastewater, chemicals, natural gas for abatement and heating, and special gases are not sized beyond the simple flows shown.
- Make-up air energy depends strongly on climate; the default is a mild figure and a hot humid or cold dry site needs a higher one.
- On-site generation is a single average figure and does not include its own fuel or capital cost in the bill unless you include it in the tariff.
Where the method comes from
The Hub's own planning arithmetic: wafer layer passes drive the process loads, cleanroom area and air change rate drive the air handling, and plant efficiencies turn flows into electricity. The defaults sit inside the public figures named in the sources.
Reference example, checked by test: Hand-worked in the tool's unit test: 300 mm, 10,000 wafer starts a month, 100% loading, 30 layers, no EUV; 10 kWh and 4 kWh a layer; 1,000 m² at 300 air changes an hour, 3 m, 600 W per m³/s, 10% make-up at 3 kWh per 1,000 m³; no nitrogen plant, compressed air, water plant, overhead or peak margin; heat 100% of tools, sub-fab and fans at COP 5; 100 litres a layer, 30% reclaim. Average power 7.3541; Peak power 7.3541; Annual energy 64.422; Energy per 12-inch equivalent layer 17.895; Peak cooling load 1,678.54; Water use 986.3; City water intake 690.41; Ultrapure water 493.15; Nitrogen flow 0; Utility cost 6,946,200.
Versions
- v1 (2026-10-25): First version, built from the tool idea.
Terms on this page
- Fab
- The cleanroom facility where wafers are processed, together with its subfab utilities, chemical distribution and automation.
- UPW
- Water purified to remove ions, organics, particles, dissolved gases and bacteria to parts-per-trillion levels, used for wafer rinsing, chemical dilution and immersion lithography.
- WSPM
- The standard measure of fab capacity, counting wafers entering the line rather than good die leaving it.
- Wafer
- A thin, polished disc of single-crystal silicon on which hundreds or thousands of identical circuits are built at the same time.
- EUV
- Lithography at 13.5 nm wavelength, performed entirely in vacuum with reflective multilayer optics because no material transmits usefully at that wavelength.
- Abatement
- Point-of-use or house treatment of process exhaust to destroy or capture hazardous and high-global-warming-potential gases before release, typically by combustion, plasma or scrubbing.
- Throughput
- The rate at which a tool or a fab completes work, expressed as wafers per hour for equipment or wafers out per month for the line.
- Utilisation
- The fraction of available placeable core area consumed by cell and macro instances, typically quoted as a percentage.
- Power density
- Output power divided by converter volume or weight, quoted in watts per cubic inch or kilowatts per litre.
- Energy per wafer
- The electricity consumed to produce one wafer or one wafer layer, used to compare fab efficiency and to project the grid demand of new capacity.
- PUE
- The ratio of a facility's total energy draw to the energy delivered to IT equipment.
- Tariff
- A duty levied on imported goods, calculated from the customs value, HS classification and declared country of origin.
Tell us what you're after and leave your email: we'll connect you with the right person on the Hub.