Fills the inputs below with typical figures. Replace any of them with your own.
- Required clearance
- 1.5 mm
- 2.5 kV impulse used, pollution degree 2
- Required creepage
- 2.5 mm
- 2.5 mm from the table
- Governing distance
- Creepage
- pollution degree 2, material group III
- Your design
- Enter your distances to check them
- Required clearance1.5 mm
- Required creepage2.5 mm
Show the data as a table
| Item | Distance (mm) |
|---|---|
| Required clearance | 1.5 mm |
| Required creepage | 2.5 mm |
Sign in to save your inputs and come back to them later.
| Impulse voltage (kV) | At 2000 m (mm) | At 2,000 m (mm) |
|---|---|---|
| 0.33 | 0.2 | 0.2 |
| 0.5 | 0.2 | 0.2 |
| 0.8 | 0.2 | 0.2 |
| 1.5 | 0.5 | 0.5 |
| 2.5 | 1.5 | 1.5 |
| 4 | 3 | 3 |
| 6 | 5.5 | 5.5 |
| 8 | 8 | 8 |
| 12 | 14 | 14 |
- Group I (solid line, circles)
- Group II (dashed line, squares)
- Group III (dotted line, triangles)
Show the data as a table
| Working voltage (V) | Group I | Group II | Group III |
|---|---|---|---|
| 10 | 0.4 | 0.4 | 0.4 |
| 12.5 | 0.42 | 0.42 | 0.42 |
| 16 | 0.45 | 0.45 | 0.45 |
| 20 | 0.48 | 0.48 | 0.48 |
| 25 | 0.5 | 0.5 | 0.5 |
| 32 | 0.53 | 0.53 | 0.53 |
| 40 | 0.56 | 0.8 | 1.1 |
| 50 | 0.6 | 0.85 | 1.2 |
| 63 | 0.63 | 0.9 | 1.25 |
| 80 | 0.67 | 0.95 | 1.3 |
| 100 | 0.71 | 1 | 1.4 |
| 125 | 0.75 | 1.05 | 1.5 |
| 160 | 0.8 | 1.1 | 1.6 |
| 200 | 1 | 1.4 | 2 |
| 250 | 1.25 | 1.8 | 2.5 |
| 320 | 1.6 | 2.2 | 3.2 |
| 400 | 2 | 2.8 | 4 |
| 500 | 2.5 | 3.6 | 5 |
| 630 | 3.2 | 4.5 | 6.3 |
| 800 | 4 | 5.6 | 8 |
| 1,000 | 5 | 7.1 | 10 |
How it works
Clearance is the shortest distance through air between two conductive parts, and creepage is the shortest distance along the surface of the insulation between them. This tool works out the minimum of each for a working voltage, a rated impulse voltage, a pollution degree, a material group, a type of insulation and an altitude, then checks the distances you have drawn. The rules follow IEC 60664-1; the figures in the tables come from a public manufacturer's guide and can be replaced with the figures in your own copy of the standard.
- Find the rated impulse voltage. The impulse voltage the insulation must withstand follows from the supply's nominal voltage to earth and the overvoltage category of the place the equipment is connected (I for specially protected circuits, II for appliances, III for the distribution level, IV for the supply origin). You can also enter a value. It is rounded up to the next value in the preferred series of 0.33, 0.5, 0.8, 1.5, 2.5, 4, 6, 8 and 12 kV.
rated impulse = table(nominal voltage to earth, overvoltage category), rounded up to the preferred series - Apply the type of insulation. Functional, basic and supplementary insulation use the rated impulse as found. Reinforced insulation uses the next step up in the preferred series for its clearance, and twice the basic creepage.
reinforced: impulse used = next preferred step above the rated impulse; creepage = 2 x basic creepage - Look up the clearance. The minimum clearance at 2000 m comes from the impulse voltage used, the pollution degree and the field shape. Case A is a non-homogeneous field and is the usual choice; case B is a homogeneous field that has to be confirmed by test.
clearance at 2000 m = table(impulse used, pollution degree, field case) - Correct for altitude. Thinner air withstands less voltage. Above 2000 m the clearance is multiplied by a factor that rises with altitude, interpolated between the table rows. Creepage is not corrected.
required clearance = clearance at 2000 m x altitude factor - Look up the creepage. Creepage follows the RMS (or DC) working voltage, the pollution degree and the material group, which comes from the comparative tracking index: group I from 600, II from 400, IIIa from 175 and IIIb from 100. Printed wiring material has its own, smaller columns for pollution degrees 1 and 2. Between table rows the figure can be interpolated or taken from the next row up.
creepage = table(working voltage, pollution degree, material group) x insulation multiplier - Take the governing distance. Creepage may not be smaller than the clearance, so the creepage required is the larger of the two. The governing distance is whichever is larger. The designed distances you enter are checked against both.
creepage required = max(creepage from table, required clearance); pass if designed clearance >= required clearance and designed creepage >= creepage required
Assumptions
- The built-in figures are those printed in a manufacturer's design guide as extracts of the IEC 60947-1 tables, which carry the values of the matching IEC 60664-1 tables. They are not read from the standard itself. Compare them with your copy before you rely on them, or paste your own figures into the tables at the foot of the inputs.
- Altitude factors are given for 2000 m to 6000 m. Below 2000 m the tables are used as printed (factor 1).
- The working voltage for creepage is the RMS value for AC and the DC value for DC. The peak working voltage is only checked against the impulse level.
- A coating that meets the protection tests of IEC 60664-3 lets the covered surface be treated as pollution degree 1; the tool takes your word that it does.
Limits and warnings
- Recurring peak voltages, temporary overvoltages and the dimensioning rules for clearances under 0.01 mm, ribs, grooves and functional insulation over long creepage paths are not covered. Product standards add rules of their own (for example IEC 62368-1 for information and communication equipment, UL 840 in North America).
- The tool gives minimum distances, not a safety approval. Solid insulation thickness, tests, and the rules of the product standard still apply.
- Clearances in air at 2000 m and below only; no table for pressurised or gas-filled enclosures.
- Above 1000 V AC or 1500 V DC the standard no longer applies and the figures are an extrapolation.
Sources
The methods and default figures rest on these public sources. The wording here is our own; read the source for its full text.
- IEC 60664-1:2020, Insulation coordination for equipment within low-voltage supply systems, Part 1: Principles, requirements and tests (opens in a new tab), International Electrotechnical Commission, 26 May 2020. The rules followed here: clearances (Clause 5.1), creepage distances (Clause 5.2), the impulse voltage by overvoltage category, pollution degree and material group. Cited by name; its tables are not reproduced.
- Application note: Low voltage control and protection products in high altitudes (document 1SAC200234W0001, Rev G) (opens in a new tab), ABB, April 2026. The public source of the built-in figures: its extracts of the clearance, creepage, impulse voltage and altitude factor tables, and a worked altitude example used in the tests. The link is a distributor's copy; search the document number if it moves.
- IEC 62368-1:2018, Audio/video, information and communication technology equipment, Part 1: Safety requirements (opens in a new tab), International Electrotechnical Commission, 4 October 2018. A product standard that applies the IEC 60664-1 rules to its own equipment and adds to them. Cited by name only.
Where it helps
The lifecycle stages this tool serves: 3 stages in 2 lifecycles.
More analog, rf, photonics and packaging tools
Method notev1Formula, ranges, sources and limits
Looks up the minimum clearance and creepage distance for a working voltage, rated impulse voltage, pollution degree, material group, type of insulation and altitude, and checks designed distances against them.
Formula
rated impulse = table(nominal voltage to earth, overvoltage category), rounded up to the preferred series; reinforced: impulse used = next preferred step above the rated impulse; creepage = 2 x basic creepage; clearance at 2000 m = table(impulse used, pollution degree, field case); required clearance = clearance at 2000 m x altitude factor; creepage = table(working voltage, pollution degree, material group) x insulation multiplier; creepage required = max(creepage from table, required clearance); pass if designed clearance >= required clearance and designed creepage >= creepage required
| Input | Unit | Range it holds for | Comes from |
|---|---|---|---|
| Voltage type | choice | ac, dc | Your figure |
| Working voltage, RMS or DC | V | 10 to 1500 | Your figure |
| Impulse voltage from | choice | category, entered | Your figure |
| Nominal supply voltage to earth | V | 1 to 1000 | Your figure |
| Overvoltage category | choice | I, II, III, IV | Your figure |
| Rated impulse voltage entered | kV | 0.33 to 12 | Your figure |
| Pollution degree | 1 to 4 | 1 to 4 | Your figure |
| Material group from | choice | group, cti | Your figure |
| Material group | choice | I, II, IIIa, IIIb | Your figure |
| Comparative tracking index | CTI | 100 to 700 | Your figure |
| Type of insulation | choice | functional, basic, supplementary, reinforced | Your figure |
| Field case | choice | A, B | Your figure |
| Altitude | m or ft | 0 to 6000 | Your figure |
| Altitude unit | choice | m, ft | Your figure |
| Surface | choice | material, pcb | Your figure |
| Protective coating | choice | no, yes | Your figure |
| Between table rows | choice | interpolate, next | Your figure |
Outputs: Required clearance (mm); Required creepage (mm); Impulse voltage used (kV); Altitude factor (ratio).
Assumptions
- The built-in figures are those printed in a manufacturer's design guide as extracts of the IEC 60947-1 tables, which carry the values of the matching IEC 60664-1 tables. They are not read from the standard itself. Compare them with your copy before you rely on them, or paste your own figures into the tables at the foot of the inputs.
- Altitude factors are given for 2000 m to 6000 m. Below 2000 m the tables are used as printed (factor 1).
- The working voltage for creepage is the RMS value for AC and the DC value for DC. The peak working voltage is only checked against the impulse level.
- A coating that meets the protection tests of IEC 60664-3 lets the covered surface be treated as pollution degree 1; the tool takes your word that it does.
Uncertainty: The lookups are exact for the tables in use. The result is as good as the figures in them, which the member should confirm against their own copy of the standard, and it is a minimum, not an approval.
Known limits
- Recurring peak voltages, temporary overvoltages and the dimensioning rules for clearances under 0.01 mm, ribs, grooves and functional insulation over long creepage paths are not covered. Product standards add rules of their own (for example IEC 62368-1 for information and communication equipment, UL 840 in North America).
- The tool gives minimum distances, not a safety approval. Solid insulation thickness, tests, and the rules of the product standard still apply.
- Clearances in air at 2000 m and below only; no table for pressurised or gas-filled enclosures.
- Above 1000 V AC or 1500 V DC the standard no longer applies and the figures are an extrapolation.
Where the method comes from
Follows IEC 60664-1:2020, Insulation coordination for equipment within low-voltage supply systems (opens in a new tab). The platform's version departs from it as follows.
- Tables Why: The standard is paid for, so the figures come from a manufacturer's public extract and can be replaced by the member.
- Scope Why: Recurring peaks, temporary overvoltages and the rules for ribs and small clearances are left to the product standard.
Reference example, checked by test: Worked example in the ABB note: a device rated 690 V at 2000 m used at 4000 m needs a rated insulation voltage of 881 V, whose creepage in pollution degree 3, material group II is the 1000 V row (14 mm, next row up); the clearance for a 4 kV impulse at 4000 m is 3 mm x 1.29. Required clearance 3.87; Required creepage 14; Impulse voltage used 4; Altitude factor 1.29.
Versions
- v1 (2026-10-25): First version, built from the tool idea.
Terms on this page
- IEC
- The Geneva-based international standards organisation for electrical, electronic and related technologies, publishing everything from component symbols and safety requirements to functional safety...
- Rate-monotonic scheduling
- A fixed-priority policy in which the shortest-period task gets the highest priority, proven optimal among fixed-priority schemes for independent periodic tasks.
- IEC 62368-1
- The IEC safety standard for audio, video, information and communication technology equipment, based on identifying energy sources that could cause harm and the safeguards against them.
Tell us what you're after and leave your email: we'll connect you with the right person on the Hub.