The third technical readiness review: the link is proven in the system it was designed for, on units of the production design. Error rate and margin hold across temperature and supply, the product conforms to the interface standards it claims, it works with partner optics and hosts, the link budget closes on measured systems and the laser safety class is measured.
2 more disciplines for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.