Use at the end of system validation, before the production release, to confirm that the link works in its target system on units of the production design: validation and interoperability passed, conformance shown, the link budget closed on measured systems, the laser safety class measured and the control firmware regression passed. Run by the validation lead with the compliance and interoperability engineer presenting.
MustThe validation lead is named as the decision owner for this technical readiness review and has confirmed attendance.
MustReviewers include someone independent of the team that ran the validation.
MustThe evidence pack was circulated early enough for reviewers to read it before the review.
MustReliability qualification has passed, so the ageing allowance the margin is judged against is confirmed.
MustThe units under review are of the production design, with the released laser, fibre attach and firmware, and are listed by revision.
ShouldThe product manager attends to hear the verdict that the production release will weigh.