Before the test program ready for silicon gate: is the program complete, checked offline and run end to end on the tester with its hardware? The test program developer checks.
MustEvery test in the specification is in the program.
MustEach reused test method has been reviewed against this part's specification.
MustLevels and timing sets match the specification and the part's operating range.
ShouldTrim and calibration routines are in the program and write results where the specification says.
23 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.