Releases the schematics, board layout, bill of materials and the mechanical and thermal design for the first prototype build. The gate chair runs it with the board-level hardware design engineer and the thermal and mechanical system engineer.
MustThe evidence pack reached every participant early enough to be read before the review.
MustThe people with decision rights for this gate are present or have named a delegate in writing.
MustConditions set at the previous gate are closed, or their status is reported with evidence.
ShouldThe criteria for this gate were agreed before the evidence was prepared, not after.
MustSchematic and layout reviews are complete, with actions closed or tracked.
MustSignal and power integrity analysis is within budget, or the risks are recorded.