The static timing analysis engineer and the place-and-route lead use this before customer design sign-off to confirm every check is clean on the design placed and routed on the fixed base and the customer has signed off.
MustRouting in the custom layers is complete, with no unrouted nets.
MustEvery change after netlist freeze went through the engineering change process and stayed within the custom layers.
MustTiming is met at every sign-off corner and mode.
SeeWork product: Customer timing and physical sign-off reports
20 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.