The last check before the fixed base layers go to the mask shop. The chip finishing and tape-out engineer runs it with the physical design, timing, DFT and foundry leads.
MustThe material under review is a tagged version, and that version is named in the record.
MustReviewers received the material and this checklist early enough to prepare.
ShouldAt least one reviewer did not take part in the work under review.
ShouldThe scope of the review and anything excluded from it are stated at the start.
26 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.