Confirms verification, physical sign-off, the prototype checks, the shuttle slot and the plans for silicon return are complete before the Test chip sign-off gate. Owned by the tapeout program manager.
MustThe test chip verification report is signed off against its plan.
SeeFlow: Sign-offWork product: Test chip verification report
ShouldScan, memory BIST and debug access work in simulation.
MustThe frozen RTL has run on the prototype platform, with the results recorded.
ShouldTest chip software runs on the prototype platform.
22 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.