Confirms the node has reached mature yield and hands it to sustaining owners. The gate chair decides with the manufacturing operations and capacity lead.
MustThe evidence pack reached every participant early enough to be read before the review.
MustThe people with decision rights for this gate are present or have named a delegate in writing.
MustConditions set at the previous gate are closed, or their status is reported with evidence.
ShouldThe criteria for this gate were agreed before the evidence was prepared, not after.
MustYield and cost reports show yield at the mature level in the plan, held over the period the plan requires.