Use at the review that releases the package or module design and its assembly process for the qualification builds. Run by the package design lead.
MustThe evidence pack reached every participant early enough to be read before the review.
MustThe people with decision rights for this gate are present or have named a delegate in writing.
MustConditions set at the previous gate are closed, or their status is reported with evidence.
ShouldThe criteria for this gate were agreed before the evidence was prepared, not after.
MustPackage or module design: released, with thermal, electrical and stray inductance targets checked against the device data.
31 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.