Use before the architecture freeze to confirm that the photonic platform, the coupling and packaging approach, the laser integration approach and thermal control can meet the link budget, with expected losses and limits stated. Run by the photonic architect with the foundry interface lead presenting.
MustThe decision owner for this technical readiness review is named and has confirmed attendance.
MustReviewers who can judge each technology in scope are invited, including someone independent of the team that did the work.
MustThe evidence pack was circulated early enough for reviewers to read it before the review.
MustThe link budget is baselined with its margin policy and the assumption behind each line.
ShouldThe packaging lead and the photonic integration engineer attend with their own evidence.
MustThe component library and process are shown able to meet the link budget, using component data at a stated maturity.
39 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.