Used at the end of Facility Design & Engineering, before Design freeze and Final investment decision, by the programme lead and discipline leads to confirm the stage's criteria, outputs, decisions and compliance evidence are complete.
MustBasis of design: approved by facilities, process, EHS and operations.
MustDetailed design package: issued for construction.
MustTool list and hook-up requirements: updated and reflected in the design.
MustDesign reviews: constructability, safety and hazard reviews closed or actioned.
MustConstruction cost estimate: at the accuracy the plan requires.
MustProgramme master schedule: baselined.