Starts die design against the frozen interface and bump map. Each die design lead runs it with the verification architect.
MustThe bump map freeze has been passed and the bump map, interface specification and budgets are baselined.
MustEach die team has the partitioning specification and its own die requirements.
MustEach die team has its share of the package power and thermal budget.