The high-speed I/O interface architect, every die team, the package team and verification review the die-to-die interface specification with this before the bump map freeze.
MustThe material under review is a tagged version, named in the record.
MustReviewers received the material and this checklist early enough to prepare.
ShouldReviewers include people from the die teams, the package team and, where needed, the assembly supplier.
ShouldThe scope of the review and anything excluded are stated at the start.
29 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.