Run by the stage lead with process assurance before verification and Structural Coverage closes at its gate, to confirm outputs, criteria, decisions and checks are complete.
MustSystem safety assessment is at final maturity and under configuration control.
ShouldCommon cause analysis is at final maturity and under configuration control.
MustHardware verification results is at final maturity and under configuration control.
ShouldElemental analysis report is at final maturity and under configuration control.
28 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.