Run by the stage lead with process assurance before work in verification and Structural Coverage starts, to confirm the entry conditions, inputs, people and tools are in place.
MustThe Build baselined gate is passed, or a conditional go with its conditions tracked.
MustThe build is baselined for formal verification.
MustVerification procedures are reviewed and released.
MustThe target test rig and test equipment are calibrated and identified.
22 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.