The results of a first implementation of the customer design on the chosen array: utilisation, routing congestion, timing and any problems found, used to confirm the array size and plan the real implementation.
Report Work product in the Structured ASIC lifecycle
A trial run shows early whether the design fits the array and can reach its timing, while the conversion is still being agreed. It reduces the risk of finding at netlist freeze that the design needs a larger array.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.