An early study of possible regions and sites for the fab, screening them against high-level needs such as utilities, water, workforce, logistics, hazards, incentives and political stability.
Analysis Work product in the Fab build and equipment qualification lifecycle
It narrows a wide field to a shortlist worth detailed evaluation, so money is not spent on detailed studies of unsuitable sites and better ones are not missed because only familiar locations were considered.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.