The record of physical checks on the base array: design rules, layout against schematic, electrical rules, antenna and density checks, and the timing and power integrity of the fixed networks, with any waivers.
Report Work product in the Structured ASIC lifecycle
The base layers are made once for every customer, so they must be clean before tape-out. The report is the evidence that they are, or that any exception is agreed with the foundry.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.