Delayed, as of 16:35 UTC. Source: delayed quotes from a public quote service, refreshed at most every two minutes. Prices in each listing's own currency. Market data, not investment advice.
Lowering cost and keeping the product competitive once it is in volume: yield and defect improvement, die shrinks and next device generations, thinner substrates, larger wafers, second-source materials, assembly cost reductions and test time reduction, each change qualified and notified to customers under change control.
Where this stage sits
This stage with its neighbours. Each row is a discipline active here, shaded by how mature its work is by the end of each stage.
Key0.0Planned0.3Concept drafted0.5Learning0.8Near target1.0CompleteFreezeFrozenFaded block: still at the step shown before it, Held below Complete or Maintained under change control once complete or frozenFreeze or sign-off pointMilestone for one item; the rest of the work carries onMilestone gateYou are here: Cost-down & SustainingAI impactDDisruption (red)AAugmentation (blue)OOpportunity (green)How AI is changing the workWhat the steps meanWhat the codes mean
Wafer Size Transition: maturity 1.0, Complete. Part released for volume orders with its datasheet and a long-term supply commitment; pricing, lifecycle reviews and discontinuance managed to the end.
Cost-down & Sustaining: maturity 1.0, Complete. Part released for volume orders with its datasheet and a long-term supply commitment; pricing, lifecycle reviews and discontinuance managed to the end.O
End of Life: maturity 1.0, Complete. Part released for volume orders with its datasheet and a long-term supply commitment; pricing, lifecycle reviews and discontinuance managed to the end.
Wafer Size Transition: maturity Freeze, Frozen. Specification and sources under change control; larger substrates and second sources come in as qualified changes.A
Cost-down & Sustaining: maturity Freeze, Frozen. Specification and sources under change control; larger substrates and second sources come in as qualified changes.
Wafer Size Transition: maturity Freeze, Frozen. Baseline under change control; transfers to larger wafers and process changes are qualified before use.A
Cost-down & Sustaining: maturity Freeze, Frozen. Baseline under change control; transfers to larger wafers and process changes are qualified before use.
Wafer Size Transition: maturity 1.0, Complete. Control plan final for production part approval; yield ramped to its mature level and improved in volume.
Cost-down & Sustaining: maturity 1.0, Complete. Control plan final for production part approval; yield ramped to its mature level and improved in volume.
Wafer Size Transition: maturity 1.0, Complete. Static, dynamic and ruggedness behaviour measured across temperature and compared with the design; repeated in the converter, on qualification lots and on larger wafers.
Wafer Size Transition: maturity 1.0, Complete. Device and module qualification passed, with failures analysed and a lifetime model; later changes requalified.
Cost-down & Sustaining: maturity 1.0, Complete. Device and module qualification passed, with failures analysed and a lifetime model; later changes requalified.
Wafer Size Transition: maturity Freeze, Frozen. Assembly process frozen with module qualification; package changes and cost-downs are qualified before use.
Cost-down & Sustaining: maturity Freeze, Frozen. Assembly process frozen with module qualification; package changes and cost-downs are qualified before use.
Wafer Size Transition: maturity 1.0, Complete. Production part approval achieved; field monitoring, change notices and records run to the end of supply.
Cost-down & Sustaining: maturity 1.0, Complete. Production part approval achieved; field monitoring, change notices and records run to the end of supply.
End of Life: maturity 1.0, Complete. Production part approval achieved; field monitoring, change notices and records run to the end of supply.
Wafer Size Transition: maturity 1.0, Complete. Capacity plan final for the volume ramp; allocation, cost-downs, wafer size moves and final builds run to the end of supply.
Cost-down & Sustaining: maturity 1.0, Complete. Capacity plan final for the volume ramp; allocation, cost-downs, wafer size moves and final builds run to the end of supply.A
End of Life: maturity 1.0, Complete. Capacity plan final for the volume ramp; allocation, cost-downs, wafer size moves and final builds run to the end of supply.A