Use when detailed test planning starts, after the DFT architecture is aligned, to confirm the strategy, parameter list and package data are ready to plan against. Run by the product engineer.
MustThe DFT architecture aligned gate has been passed and its decision record is filed.
MustThe test strategy and first cost model are available at their approved revision.
MustA preliminary datasheet or a parameter list exists.
22 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.