Use for each change to a released test program, its limits, patterns or hardware, including tester software and platform migrations. Run by a review chair with the product engineer and quality.
MustThe material under review is a controlled revision, and that revision is named in the record.
MustReviewers received the material and this checklist early enough to prepare.
ShouldAt least one reviewer did not take part in the work under review.
ShouldThe scope of the review and anything excluded from it are stated at the start.
28 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.