Use when checked-out test hardware is handed from hardware engineering to the program developers for the pre-silicon tester run. Run by the test hardware engineer as sender and the test program developer as receiver.
MustEach hardware item is listed with its serial number and revision.
MustThe checkout report for each item is included, with failures fixed or waived.
MustThe final resource map matches the hardware as built.
16 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.