Starts the production validation build on the production line once certification tests are passed, leading to the production release. The hardware NPI engineer runs it with the product line manager.
MustCertification tests passed has been reached, and certificates are issued or due for every target market.
MustThe design for production is under change control, and changes since validation are assessed for their effect on certification.
MustThe production line, its tooling and its fixtures are ready for the production validation build.