Starts the engineering prototype build and system integration once the board and enclosure are released and software runs on prototypes. The board bring-up engineer runs it with the hardware NPI engineer.
MustBoard and enclosure released for prototype build has been passed, and the fabrication data and bill of materials are at their released versions.
MustThe engineering prototype build plan sets the quantity, the configurations and who receives each unit.
MustParts for the build are in stock or have confirmed delivery, and shortages have substitutes approved by engineering.