Before the Product sign-off gate: are verification, physical sign-off, test and the preparations for the tape-out complete on the frozen design? The program and tape-out manager confirms.
MustEvery change since the last full regression has been re-verified.
MustCoverage and regression goals in the plan are met, or waived with reasons.
MustIP integration checks are clean.
MustTiming at every sign-off corner, power integrity, physical verification and foundry checks are clean or waived.
SeeDecision: Sign-off corners and margins for product siliconFlow: Waivers against rules and temporary deviationsWork product: Physical sign-off report
22 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.