Reviews every waiver against lint, clock and reset domain crossing and power intent checks, before the IP RTL freeze and before each release. The IP development lead runs it with the verification architect.
MustThe rule sets used are the agreed ones, at recorded versions.
MustChecks were run in every supported configuration, not only the default.
MustCrossing checks use constraints that describe the block boundary as an integrator will see it.
ShouldPower intent checks were run where the block has several power domains.
SeeStandard: IEEE 1801
28 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.