Use at Qualification start, before parts built on the production flow enter qualification testing. Prepared by the reliability qualification engineer; the quality and reliability lead decides with program management.
MustQualification parts are built on the production flow, and their build history shows the wafer process, mask set, assembly site, package, materials and test flow.
MustAny difference from the production flow is listed and its effect on qualification assessed.
MustThe qualification plan is approved and names the standard for each target market.
SeeStandard: JEDEC JESD47Standard: AEC-Q100
MustThe plan states the tests, conditions, lots, sample sizes and acceptance criteria each standard requires.
MustThe plan covers the package as well as the die, including the moisture sensitivity classification.
SeeStandard: IPC/JEDEC J-STD-020Standard: JEDEC JESD22