Checks that every mechanism is qualified on the baseline and every failure is understood, ahead of the technology qualified gate. Owned by the process reliability lead.
MustEvery mechanism in the plan has results from samples built on the frozen baseline, from the number of lots the plan requires.
MustAll planned stresses are complete, including the long running interconnect and dielectric tests.
MustStress conditions stay within the range where the acceleration model is valid, and the model and its parameters are stated.