Builds and correlates the extraction decks and the interconnect technology file as interconnect data arrives. The parasitic extraction engineer runs it.
MustAn initial interconnect technology file exists from the alpha release.
MustMetal stack options are known, with the plan to freeze them by the beta release.
MustInterconnect test structures are on the test vehicles and measurement data is arriving from the frozen baseline.
20 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.