Exit check for Packaging That Admits the Environment before its gate: exit criteria, work products, quality checks, decisions and hand-offs. Owned by the package Architect.
MustThe package design is final, with port, seal or window details.
MustPackage stress sensitivity is shown to be within the error budget across temperature and board mounting.
MustThe stress isolation design is final.
MustThe assembly process flow is released for qualification builds.
MustEarly reliability results on prototypes show no unexplained failure mechanisms.
32 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.