Used by change control, safety, certification and engineering leads to review a proposed change to fielded equipment before it is implemented and released.
MustThe reason for the change is recorded, such as an in-service problem, obsolescence or an improvement.
MustThe configuration being changed is identified from the configuration index.
MustEvery affected requirement, design element, code module and test is identified from the trace data.
MustAffected tools and environment are identified.
MustAffected component part numbers are identified.
30 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.