Use to review the safety case and the safety manual before the functional safety assessment completes. Run by the functional safety manager with the customer program manager.
MustThe work product under review is a controlled version, named in the record.
MustReviewers received the material and this checklist early enough to prepare.
MustReviewers have the independence the safety plan requires for this work product and ASIL.
SeeStandard: ISO 26262
ShouldThe scope of the review and anything excluded are stated at the start.
26 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.