For the start of design space exploration with a performance model, once the workload set is agreed. The performance modelling lead runs it.
MustThe target workload set is agreed, characterised and baselined under change control.
MustCost and power constraints from the business case are known to the modelling team.
MustA modelling approach and its level of detail are agreed, from analytical models to cycle level models.
20 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.