The evidence for the TR1 gate of a system or a platform: whether the technologies it depends on are ready, covering key chips and modules, power, thermal and size budgets, and software and security technology, with each gap and the plan to close it.
Analysis Work product in the System development lifecycle and the Platform and derivative products lifecycle
It stops the programme committing to a system or platform that cannot be built with the technology available in time. Gaps found here can be closed by choosing other parts or changing targets; found after design starts, they cost redesigns, and on a platform every derivative inherits them.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.